Story Bridge to be repainted for the first time in $80m project

0
9

Brisbane’s ‘coat-hanger’ – the Story Bridge – is to be repainted for the first time in its 79 years spanning Kangaroo Point to Fortitude Valley.

Written by Tony Moore
This news first appeared on https://www.smh.com.au/national/queensland/story-bridge-to-be-repainted-for-the-first-time-in-80m-project-20190214-p50xwl.html?ref=rss&utm_medium=rss&utm_source=rss_national under the title “Story Bridge to be repainted for the first time in $80m project”. Bolchha Nepal is not responsible or affiliated towards the opinion expressed in this news article.